Terraced & Semi-Detached Modular Townhouses
Maximum plot yield for urban infill sites. Serial manufacturing and decoupled party walls engineered for privacy and thermal comfort.
Project Quick Facts
01 Project Overview
Designed for narrow urban frontage parcels, our terraced townhouses combine repetitive modular efficiency with high-end architectural appeal. Modules are craned in succession to deliver entire streetscapes rapidly.
02 Layout & Floor Plan Scheme
Ground floor open-plan kitchen and living areas open directly to private rear gardens, with bedrooms and office retreats arranged above.
03 Living Spaces & Module Zones
Sound-decoupled party walls between adjacent homes ensure complete acoustic autonomy and zero vibration transfer.
04 Circulation, Stairs & Shaft Solutions
Straight-flight or compact quarter-turn stairs placed against party walls maximize open frontage and daylight penetration.
05 Wet Areas & Kitchen Integration
Upstairs family bathrooms and ground-floor powder rooms are fully completed in the factory with European sanitary fittings.
06 MEP & Utility Infrastructure Connections
Factory-routed service risers and quick-connect water and power lines ensure rapid hookup to municipal networks.
07 HVAC & Mechanical Ventilation
Compact air-source heat pumps and quiet MVHR ventilation maintain high energy efficiency and fresh indoor air.
08 Structural Steel Frame & Interlocking
Precision welded structural steel frame providing robust structural integrity and lifetime durability.
09 Building Envelope, Insulation & Façade
Multi-layer thermal envelope with timber, metal or render cladding tailored to local planning guidelines.
10 Site Master Plan & Foundation Interface
Continuous strip or raft footings with pre-surveyed anchor bolt arrays.
11 Scope of Delivery & Demarcation
Turnkey prefabricated modules delivered to site; foundations and external connections delivered locally.
12 Cost Methodology & Budget Framework
Predictable per-unit pricing enabling developers to calculate exact project margins upfront.
13 Manufacturing, Logistics & Crane Erection
Sequential crane erection with each house assembled in 1–2 days.
14 Destination Local Codes & Eurocode Compliance
Eurocode certified engineering and compliance with European building and energy performance regulations.