2026 Modular Home Prices & Cost Breakdown
Factory-manufactured 3D volumetric steel modules deliver guaranteed contract pricing, eliminating budget overruns while cutting delivery timelines by up to 70%.
Indicative Cost per m² Packages (2026)
All packages engineered to EN 1090-2 (EXC3) execution class and Eurocode 3 standards.
Structural Shell & Facade
Primary 3D volumetric steel frame, external weather barrier, high-performance roof membranes and ground anchor interfaces.
- EN 1090-2 EXC3 Structural Steel
- Façade Insulation & Vapor Tightness
- Integrated Lifting & Corner Castings
Advanced Shell & Pre-piped MEP
Adds triple-glazed architectural joinery, pre-piped electrical/plumbing conduits, and acoustic partition walls.
- Triple-glazed Windows (Uw ≤ 0.85)
- Pre-installed MEP Conduits & Junctions
- Rw 58dB Acoustic Floor & Wall Underlays
Full Turnkey Residential
Complete off-site fit-out including factory-fitted bathroom pods, kitchen joinery, engineered flooring, sanitaryware and lighting.
- Fully Fitted Bathroom Pods & Sanitaryware
- Architectural Kitchen & Flooring
- Factory Blower Door Test Certification
Volumetric Steel vs Conventional Concrete
Total construction budget encompasses labor risks, carrying costs of capital, and weather exposure.
| Performance Parameter | SERMODULA Volumetric Steel | Traditional Concrete In-situ |
|---|---|---|
| Total Construction Time | 60 - 90 Days (Concurrent) | 12 - 18 Months (Weather dependent) |
| Budget Predictability | 100% Fixed Contract (Zero Overrun) | 20% - 35% Typical Cost Overrun |
| Seismic Resilience | Ductile S355 Steel, Low Inertial Mass | High Mass, Prone to Cracking |
| Thermal Efficiency | Passivhaus / KfW 40 (U ≤ 0.14) | B / C Sınıfı Standart Yalıtım |
| Circularity & ESG | 98% Recyclable Steel Frame & Demountable | High Demolition Waste & Embodied CO2 |
Site Ancillary & Civil Cost Considerations
We engineer the complete lifecycle to prevent unforeseen on-site expenditures.
Engineered Ground Slab
Because volumetric steel is 60% lighter than concrete, foundation concrete volume and excavation costs are substantially reduced.
Low-bed Road & Maritime
Turnkey freight from Türkiye fabrication plant to any European plot via permitted lowbed trailers or Ro-Ro shipping.
Precision Lifting Rig
High-capacity telescopic mobile cranes position modules in under 45 minutes each, erecting full buildings in 2 to 4 days.
Structural Sign-off
Complete Eurocode 3 calculation dossiers provided for local architectural and structural planning approval.
Calculate Your Project’s Modular Budget in 30 Seconds
Select your preferred dwelling typology, floor area and destination country to generate an immediate indicative budget breakdown.