Open Engineering & Project Standards

Technical Specifications & Project Document Center

Review official SERMODULA engineering protocols, Eurocode compliance matrices, ITP quality plans, BIM requirements and request stamped project dossiers.

DOC-01 Architecture & Spatial

Project Briefing & Spatial Requirement Dossier

Comprehensive spatial matrix, module count, local zoning criteria, finish grades, and budgetary constraints template for modular residential planning.

DOC-02 Commercial & Cost

Turnkey Scope & RACI Responsibility Matrix

Defines the exact split of duties between SERMODULA, the Client, Local Architects, and Groundworks Contractors from permit approval to handover.

DOC-03 Engineering & BIM

Building Envelope Layers & Joint Registry

Exhaustive cross-sectional schedules of exterior walls, party walls, floor-ceiling cassettes, waterproofed flat roofs, and millimeter junction details.

DOC-04 Engineering & BIM

Performance & Eurocode Compliance Evidence Dossier

Laboratory test citations, thermal U-value calculations, acoustic sound reduction indices (Rw/Ln,w), and reaction-to-fire classifications for building permit authorities.

DOC-05 Quality & ITP

Off-Site Inspection & Test Plan (ITP)

7-Stage gate hold-point protocol covering mill certificates, welded frame metrology (±1.5mm), corrosion coating, MEP pressure testing, and final wrapping.

DOC-06 Logistics & Site

Heavy Logistics, Transport & Crane Readiness Guide

Access road dimensions, turning radius analysis, crane pad soil bearing capacity requirements, lifting sling angles, and weather hold criteria.

DOC-07 Commercial & Cost

Handover Protocol, Maintenance Manual & 10-Year Warranty

Defect liability periods, 10-year structural warranty terms, scheduled preventative maintenance intervals, and emergency service contact procedures.

DOC-08 Engineering & BIM

BIM Deliverables Protocol & DfMA Level of Detail (LOD 400)

OpenBIM IFC exchange schemas, Clash Detection tolerances, CNC automated export formats (STEP/DSTV), and coordination between architectural and structural models.

DOC-09 Commercial & Cost

Commercial Proposal Framework & Payment Milestone Schedule

Standard milestone payment gates (Engineering Deposit, Material Procurement, Factory Release, On-Site Commissioning) protecting both parties under international law.

DOC-10 Architecture & Spatial

Model & Reference Publication Specifications Template

Standardized technical layout for publishing architectural case studies, volumetric module diagrams, net-to-gross floor area ratios, and spatial specs.

DOC-11 Commercial & Cost

Legal Framework, GDPR & Technical Measurement Policy

Personal data handling compliance (GDPR / KVKK), architectural intellectual property protection, non-disclosure agreements (NDA), and dispute resolution.

DOC-12 Commercial & Cost

90-Day Execution Roadmap & Developer Milestone Plan

Sprint-by-sprint guide from geotechnical verification and architectural permit filing to off-site fabrication slot booking and crane reservation.

DOC-13 Commercial & Cost

175-Item Off-Site Manufacturing & Logistics Cost Matrix

Exhaustive line-by-line financial breakdown covering raw structural steel, envelope membranes, glazing, MEP manifold modules, inland trucking, sea freight, and mobile crane crane-hours.

DOC-14 Engineering & BIM

BIM Level LOD 350 / 400 & IFC Digital Integration Protocol

3D parametric modeling, Revit/Tekla open-BIM IFC exchanges, MEP clash detection, CNC manufacturing codes (STEP/DSTV), and site as-built coordination.

DOC-15 Logistics & Site

Mobile Crane Rigging Angle, Site Hoisting & Erection Safety Manual

Tandem crane lift capacities, spreader beam configurations, 60° sling angle thresholds, wind speed limits, and millimeter-precision foundation anchoring.

Knowledge Base

Frequently Asked Questions

How can we obtain official certified project specifications?
Click "Review Specification" or "Request Official Copy" on any document to contact the SERMODULA Technical Documentation Desk directly via WhatsApp. A customized, lot-specific dossier will be prepared.
Can we customize the Project Brief (DOC-01) for our development?
Absolutely. The brief is structured as an interactive framework. Once reviewed, share your preliminary lot data with our technical team for an immediate engineering assessment.
Who prepares and approves the engineering compliance documents?
All structural, thermal, and acoustic documentation is produced by the SERMODULA Engineering and Architecture Studio and verified with licensed local partner engineers.
What is the purpose of the 175-item cost matrix (DOC-13)?
It offers institutional transparency, detailing raw steel, envelope layers, MEP quick-connects, freight miles, and crane hoisting hours without hidden contingencies.
Are these specifications compliant with European Eurocodes?
Yes. All technical documents align strictly with EN 1990 (Basis of design), EN 1993 (Design of steel structures), and EN 1090-2 (Execution of steel structures EXC2).