On-Site Modular Installation
Rapid crane lifting, precision alignment, inter-module structural bolting and weather-tight flashing.
Concrete Deliverables & Engineering Outputs
Every delivery includes fully coordinated CAD/BIM models, verified calculation sheets and quality acceptance records.
Assembled Weather-Tight Building Enclosure
Structural Torque Bolt Tightening Log
Module Weather-Sealing Sign-Off Form
Inputs Required from Client & Site
Compacted crane platform, wide access corridor for trucks, temporary site power and local safety permits.
Scope Boundaries & Clear Responsibilities
Covers module-to-foundation and module-to-module assembly; hard landscaping and perimeter walls are separate packages.
Detailed Methodology & Execution Scope
Confirm the site and lifting plan
Before mobilisation, the parties review access, foundations, anchor locations, working areas and the lifting arrangements. The installation contractor, crane provider and site manager need compatible plans. Where cores or other elements are built locally, their completion and tolerances must match the intended module sequence.
Connect each required layer
Installation can include placement, structural fastening, weather seals, insulation continuity, acoustic interfaces and specified fire-related junctions. Services connections and local finishes follow their coordinated details. Work items are checked before they are concealed, with records and outstanding tasks linked to the relevant module or building zone.
Define resources and handover
The offer identifies labour, lifting equipment, local assistance, travel, accommodation and tools where applicable. External utilities, earthworks and landscaping are separately described. Progress moves toward commissioning through an agreed inspection and punch-list process; the production period alone does not describe the time needed to complete the site.
Standard 4-Step Delivery Process
All interfaces between engineering, factory line and on-site assembly follow a verified schedule.
Brief & Zoning
Site zoning, dwelling mix and preliminary budget limits defined.
BIM & Eurocode
Eurocode 3 structural frame and LOD 400 MEP coordination completed.
Module Assembly
Climate-controlled production and Factory Acceptance Testing (FAT).
Crane Lift & Sign-Off
Swift crane installation, weather sealing and turnkey handover.
Frequently Asked Questions about this Service
How many modules can be assembled per day?
Typically 4 to 8 modules per day, meaning an entire single-family home or villa is fully assembled in 1 to 2 days.
What happens if it rains during crane day?
Each module remains sealed in its waterproof transport wrap until the exact moment of lifting; critical joints are sheltered immediately.
Related Engineering & Design Services
← View All 21 ServicesTechnical Installation Supervision
Senior factory-trained supervisors guiding client's local contractors during crane lifting and hookup.
Export and Modular Logistics
Road, sea and intermodal routing from factory gate to final foundation with shrinkwrap protection.
Commissioning and Handover
System energisation, MEP pressure tests, airtightness verification and complete handover documentation.
Start Your Modular Project with this Service
Submit your plot details, architectural brief or unit requirements to receive an indicative technical evaluation and structured quotation from our engineering team.