D02 · TECHNICAL LOGISTICS PROTOCOL Eurocode & Incoterms 2020 Compliant

Inclusions, Exclusions & Responsibility Matrix

Turning the vague phrase "turnkey" into an explicit 21-work-package schedule of responsibilities: what happens in our Turkish factory versus what is delivered by local destination contractors.

Production Origin
İstanbul / Türkiye
Industrial Modular Plant
Typical Delivery
8 - 12 Weeks
From Design Sign-Off
Structural Standard
EN 1090-2 & EN 1993
Eurocode Steel Execution
Logistics & Export Desk
SERMODULA Global
Technical Delivery Coordination

Engineering & Operational Principles

Interior Dwelling Scope (100% Factory Offsite)

Structural framework, A1 fire insulation, windows with triple glazing, finished bathrooms with porcelain stoneware and sanitaryware, fitted kitchens, interior doors and pre-wired electrical distribution boxes.

Verified Protocol Scope

Building & Infrastructure Interfaces (Site Coordination)

Staircases, lift cores, corridors, concrete foundations, mains utility hookups (water, power, sewer), and ground landscaping are coordinated with the local main contractor.

Verified Protocol Scope
Knowledge Base

Frequently Asked Questions

Why is foundation construction excluded from factory supply?
Concrete foundations require on-site ground soil excavation, soil compaction, and local municipal inspections under national building codes. SERMODULA provides all certified anchor bolt layouts and reaction load diagrams.
Are kitchens and bathrooms fully finished upon arrival?
Yes. Sanitaryware, brassware, vanity units, mirrors, wall tiling, kitchen joinery and sink mixers are installed and pressure-tested in the factory prior to crating.
Who connects the modules to the destination municipal power and water grids?
Connection to external municipal mains must be executed by local licensed utility contractors who sign off the statutory connection permits required by local utilities.
What documents prove that the factory scope complies with standards?
We supply complete EN 1090-2 (EXC3) steel certificates, CE performance declarations, third-party weld test reports, and factory inspection dossiers (DOC-05 ITP).
Can the scope be customized to "Shell & Core" for local developers?
Yes. We frequently supply closed structural envelopes (heavy steel, exterior insulation, weatherproofing, windows) where developers complete interior joinery locally.