Delivery Options & Commercial Handover Interfaces

Establishing who delivers each part of the project: factory offsite manufacturing in Türkiye, multimodal transport, or destination crane erection and technical supervision.

Production Origin
İstanbul / Türkiye
Industrial Modular Plant
Typical Delivery
8 - 12 Weeks
From Design Sign-Off
Structural Standard
EN 1090-2 & EN 1993
Eurocode Steel Execution
Logistics & Export Desk
SERMODULA Global
Technical Delivery Coordination

Engineering & Operational Principles

1. Factory Scope (FCA / FOB Türkiye)

Includes structural steel engineering, automated offsite assembly, factory quality inspections (ITP), waterproof crating, and loading onto transport trailers at our manufacturing plant.

Verified Protocol Scope

2. Delivered to Jobsite (DAP / DDP)

Cross-border road freight, Ro-Ro maritime corridors, oversized transport transit permits, pilot car escorts, and export customs clearance (ATR/T1) delivered directly to your plot boundary.

Verified Protocol Scope

3. Turnkey Assembly & Site Supervision

SERMODULA site supervisor guides the crane lifting, structural bolt tightening, inter-module seismic shear locking, and weatherproofing joint close-outs over prepared foundations.

Verified Protocol Scope
Knowledge Base

Frequently Asked Questions

What is the most cost-effective delivery Incoterm for European projects?
DAP (Delivered at Place) is recommended. SERMODULA handles the complex multimodal freight and export permits from Türkiye directly to your site boundary, while the local client manages crane offloading and foundation anchors.
Can we arrange our own logistics carrier from Türkiye?
Yes, under FCA (Free Carrier) terms. SERMODULA provides all certified crating, lifting diagrams, center of gravity data, and loads your trucks at our factory gates.
Are transport insurance and cargo risks covered?
Under DAP/DDP, comprehensive All-Risk marine and road cargo insurance is held by SERMODULA until physical delivery at your jobsite.
Does SERMODULA provide an erection supervisor on site?
Yes. An experienced structural engineer or master assembler guides your local crane operators and rigging crew to ensure structural tolerances and joint seal integrity.
How many modules can be hoisted and locked in a single day?
Typically 4 to 8 modules per working day depending on site access, wind conditions and building geometry. A 2-storey home is locked in 1 to 2 days.