R01 Manufacturing & QC 9 min read

How Modular Homes Are Manufactured: Inside the Industrial Factory

Step-by-step insight into EN 1090-2 certified structural steel welding, wall build-ups, bathroom pod integration, and factory-level inspection test plans (ITP).

1. CAM Engineering & Structural Steel Framing (EN 1090-2)

Manufacturing begins directly from locked 3D BIM models exported into CNC cutting and drilling code. High-grade structural steel profiles are robotic-welded on precision jigs to ensure less than 1.5 mm diagonal tolerance across 12-meter frames.

All steel frames undergo shot-blasting and receive multi-layer anti-corrosion primer coatings complying with ISO 12944 C3/C4 atmospheric durability classes.

2. Envelope Layers, Wet Pods & Inspection Test Plan (ITP)

Floor, wall and ceiling build-ups incorporate certified non-combustible rockwool insulation, acoustic isolation membranes and vapor-permeable air barriers.

Pre-tested sanitary pods with installed ceramic tiles and leak-proofed membranes are secured inside the module frame before wall closure. Every step is signed off in an Inspection and Test Plan (ITP) before dispatch packaging.

Technical Data & Benchmark Matrix

Production Stage #1

Stage 1: Frame Assembly

Key Operations & Materials
CNC Sawing, Robotic Tack & Seam Welding
Tolerance / Quality Standard
EN 1090-2 Execution Class EXC2/EXC3 (±1.5 mm)
Production Stage #2

Stage 2: Corrosion Protection

Key Operations & Materials
Shotblasting SA 2.5, Epoxy Primer & Topcoat
Tolerance / Quality Standard
ISO 12944 C3/C4 (DFT ≥ 160 μm)
Production Stage #3

Stage 3: Thermal Envelope

Key Operations & Materials
Rockwool 0.035 W/mK, Vapor Barrier, OSB/Fermacell
Tolerance / Quality Standard
Class A1 Non-Combustible, Airtight Taped Joints
Production Stage #4

Stage 4: Wet Pod & MEP

Key Operations & Materials
Pre-assembled Pods, PEX Piping, Sockets
Tolerance / Quality Standard
Hydrostatic Pressure Test @ 6 Bar for 24h
Production Stage #5

Stage 5: Finishes & Glazing

Key Operations & Materials
3-Pane Argon Windows, Flooring, Paint
Tolerance / Quality Standard
EN 14351-1 Window CE Certification
Production Stage #6

Stage 6: Dispatch Packaging

Key Operations & Materials
Heavy-Duty UV Protective Shrink-Wrapping
Tolerance / Quality Standard
Weatherproofed for Maritime Ro-Ro / Highway Transit
Engineering Advisory

Let's Evaluate Your Modular Project Together

Contact our technical engineering team for plot analysis, Eurocode structural planning, and preliminary budget estimates.

Explore

Related Solutions & Guides

View All
Knowledge Base

Frequently Asked Questions

Can clients visit the factory to inspect their modules during production?
Yes. SERMODULA welcomes clients and supervising architects to our production facilities in Türkiye. We organize scheduled factory acceptance milestones (FAT) before dispatch.
Does SERMODULA build permanent permitted homes or temporary modular containers?
SERMODULA builds 100% permanent residential architecture on concrete foundations complying fully with European building regulations, Eurocode standards and local zoning laws. They are permanent real estate assets designed for a 60+ year lifespan.
Where are the volumetric modules manufactured and what quality standards apply?
All modules are manufactured in our modern offsite facilities in Türkiye under EN 1090-2 (EXC3) execution class for structural steel, CE conformity marking and ISO 9001 certified Inspection and Test Plans (ITP).
How are acoustic and fire separation performance guaranteed between apartments?
When volumetric modules unite, an independent double-steel-wall system with decoupled air cavity and acoustic damping is created, achieving airborne sound insulation of Rw >= 58 dB and fire resistance of REI 90 to REI 120.
How are turnkey modular costs calculated without hidden extras?
Instead of quoting vague single-figure square meter rates, our 175-item cost baseline itemizes factory fabrication, road/sea freight, craneage, local foundations and engineering fees in a transparent project feasibility budget.